Skip to content

A salmon processing facility at Aukra.

Vikenco on Rindarøya in Aukra is a salmon processing plant planned for long-term growth. It was built in two stages, completed in 2021 and 2022. The building combines filleting, freezing, storage, loading zones, offices and technical functions in one integrated industrial layout. Production is organised for continuous flow and future expansion, with space for several filleting lines. The structure is concrete elements with hollow-core slabs and sandwich-panel ceilings. The plant is designed for more further processing and better working conditions.