Architecture shaped by industrial process

We design industrial buildings around production flow, hygienic zoning, technical systems and future expansion - in Norway and internationally.

Roots back to 1964
InnovaMar Frøya

How we work

Every project starts with the production process - not the building. Equipment layout, material flow, hygienic zoning and future expansion requirements are resolved before a wall is drawn.

1
Feasibility & process analysis

Production requirements, equipment layout, flow mapping, hygienic zoning, capacity targets and site constraints.

2
Facility concept

Building programme, spatial organisation, structural grid, utility routing and phased expansion strategy.

3
Detailed design

Regulatory documentation, technical coordination, 3D modelling and equipment integration verification.

4
Construction documentation

Complete drawing sets, specifications and tender documentation for construction.

Get in touch

Øystein Thommesen Managing Director / Architect MNAL